Getinge Hybrid OR

Road map to Hybrid suite

Optimizing the planning process for designing and commissioning the single-discipline, multidisciplinary
and multi-modality Hybrid OR.

Download the Hybrid OR guide
Getinge VARIOP OR

The questions not asked can cost you

The who, what, where and when of effective Hybrid OR planning determines just how future-proof your implementation will be. And it all starts by asking the right questions to help you achieve your short- and long-term goals. Such as “what is the anticipated impact of room design on future workflows and collaboration?” And “how will hygiene and sterility be ensured during surgery?” Includes eight must-ask questions you’ll need answers to.

Download the Hybrid OR guide

15 to 30 months of planning

The complexity and duration of Hybrid OR planning and implementation require the timely free flow of information among key stakeholders in each of the three phases of your Hybrid project. You may not have considered all of the individuals whose perspectives and professional self-interests are vital to ensuring long-term project success. Learn how to set realistic timelines and expectations and find out who should be involved each step of the way.

Download the Hybrid OR guide

Phase 1 - Successful projects start here

Phase 1 of the Hybrid OR project planning process typically involves a period of analysis and evaluation from three to six months. During this time, clinical needs of various disciplines are defined, hygiene requirements are evaluated, usability and ergonomics are discussed and workflows are established. Discussions are focused on the selection of the appropriate imaging modalities and OR table systems that are best aligned with these requirements.

Why old rules don’t always apply

The inter-relationship between surgical and imaging equipment dictates that the performance of any Hybrid OR will be limited by the effectiveness of its weakest link. A single mistake early in the planning process can have serious consequences in subsequent project phases. Effective planning should take into account anticipated utilization of the Hybrid OR over the next three to five years. In addition, establishing a Hybrid OR within the hospital's existing structural footprint may add further challenges.  See what the important considerations are over this time period.

Download the Hybrid OR guide

Start with the right imaging system

One of the most critical decisions in planning an effective Hybrid OR is selecting one or more imaging systems that best can enhance the quantity and quality of diagnostic data throughout each step of the image-based procedure – planning, guidance and final check-up. Find out more about the diagnostic advantages of different imaging modalities.

Download the Hybrid OR guide

Siemens OR3D

Picture the possibilities in 3D

Stakeholders are typically challenged to envision the relationship of the Hybrid OR’s footprint to the installed array of equipment. Vendor-specific software generates lifelike 3D renderings of the proposed room design populated with staff and equipment selections that provide an accurate visualization of the room. 3D software also helps visualize avoidable conflicts (collisions) while verifying that proper hygienic measures have been incorporated.

Download the Hybrid OR guide

Flexible tables for a flexible OR

Hybrid OR utilization continues to evolve, especially as the frequency and complexity of minimally invasive surgeries increase over a wider range of specialties. That’s why surgical tables should incorporate two or more interchangeable carbon fiber and universal table tops that quickly can be configured to accommodate a wide range of procedures. We’ve compiled a set of important requirements including the need to achieve safe and flexible patient positioning.

Download the Hybrid OR guide

Minimizing risk - increasing usability

In the Hybrid OR, room design and equipment placement must be flexible enough to accommodate increased numbers of people and their need to have an unimpeded view of imaging data without compromising workflow efficiencies. At the same time design and equipment placement play a significant role in helping your clinical staff prevent contamination and the risk of infections in the Hybrid OR. More people and equipment mean more opportunities for problems and unwanted staff movement. Learn what the key imperatives are to ensure effective hygiene and safety while enhancing room usability and ergonomics.

Download the Hybrid OR guide

Phase 2 - Understanding the costs

Phase 2 focuses on the wide array of budgetary considerations that determines total project costs. These calculations reflect equipment costs as well as the additional initial planning time that’s required to ensure that all systems and platforms co-exist in harmony to avoid expensive remediation. Budgets should also take into account all safety, hygienic, usability and ergonomic considerations.

Getinge Hybrid Infographic

Budgeting for the Hybrid OR

Hospitals have a wealth of historical financial data to guide present-day calculations for funding a new traditional OR. For the Hybrid suite, administrators can expect to spend an additional 70-90% to populate the room with imaging equipment, integration software and the high-resolution monitors needed to manage the overwhelming flow of image-based information and patient data.

These calculations also reflect the additional initial planning time that’s required to orchestrate these multiple interfaces. It has been found that a number of hospitals allocate a large portion of the cost differential associated with the imaging system to multiple cost centers, given the Hybrid OR’s flexibility to schedule non-surgical radiology examinations. Budget approvals for a Hybrid OR have increasingly been justified on this basis as well as on the shared-use aspect of the room among multiple disciplines.

Phase 3 - Getting to the finish line

Phase 3 of the Hybrid OR project requires continuity of involvement by stakeholders who participated in Phase 1 and Phase 2. Successful installation and commissioning also require the elimination of uncertainty among staff members who face daily changes to their interactions with each other and their new Hybrid OR environment. Creating an effective training regimen is one of the most important elements of this final phase.

No last minute surprises

After months of intensive coordinated planning, the Hybrid OR commissioning date is finally in sight. At this point in the process, successful installation relies heavily on confirming the room configuration, equipment specifications and exact placement of all Hybrid OR technology. Read more to better understand the issues that could jeopardize project completion deadlines and view six important considerations for creating an effective training regimen.

Download the Hybrid OR guide

Reviewing the total keys to success

Optimizing the design and commissioning of a single-discipline, multi-disciplinary and multi-modality Hybrid OR requires the implementation of key learning in all three phases of the planning process. Learn what the eight essential strategic considerations are that experience shows has the greatest potential impact on project success.

Download the Hybrid OR guide

Actual Hybrid OR implementations

A solid Hybrid OR concept is designed with workflow, hygiene and safety in mind. 3D modeling of the Hybrid OR, including the placement of equipment and staff (to scale), helps visualize workflows and relative positioning of multiple elements in the hybrid environment.

Download these informative graphics that illustrate a number of international single- and multi-modality implementations of effective Hybrid OR planning.

Download the Hybrid OR guide

Room planning examples

Please find some examples of different Hybrid OR scenarios with each of our imaging partners.

Project planning - Welcome to Getinge Hospital Solutions

For decades, Getinge has delivered outstanding room designs that have efficiently integrated complex technologies into complete concepts for cath labs and Hybrid ORs. Getinge Hospital Solutions offers comprehensive 3D project planning, room visualization and implementation for your Hybrid OR. Our solutions are tried and tested to ensure that patients get first class medical treatment in a configuration that is tailored to the needs and workflow of your hospital.

Find out how Getinge Hospital Solutions can help you